Sector · GCC-S03
Grid connection consultants for solar PV
Solar connections range from rooftop systems under G98 to large ground-mounted farms connected at 132 kV or to the transmission network. For larger schemes, the grid connection is often the factor that decides whether a site is viable.
- Typical size
- Under 1 MW (commercial rooftop) to 100 MW+ (utility scale)
- Typical voltage
- Low voltage to 132 kV; transmission for the largest farms
- Technical standard
- G98 / G99, with G100 for export limitation
- Timeline
- Smaller distribution connections can be quicker; larger schemes depend on Gate 2
Connecting solar pv in the UK
Consultancies in this category handle feasibility, G99 applications, export limitation design, offer review and co-location with storage.
Current regulatory issues
- Larger solar farms are subject to connections reform readiness and alignment tests.
- Planning consent route depends on scheme size; very large schemes may fall under the nationally significant infrastructure regime.
Track record counts only projects in this sector.
Best grid connection consultants for solar pv
Ranked by a published formulaMethodology
| Rank | Consultancy | Services | DNO coverage | Typical size | Score |
|---|---|---|---|---|---|
| 01 | EnergyForce Withernsea · est. 2014 · 6-15 staff Unverified EV hubs · Industrial · Solar · BESS | Services | DNO areas14/15 | Size40–250 kW | Score36.9 |
| 02 | Power On Connections Coventry · est. 2003 · 200+ staff Unverified Data centre · Industrial · Housing · BESS · Solar · Wind | Services | DNO areas14/15 | Size500 kW – 100 MW | Score35.9 |
| 03 | Green Cat Renewables Biggar · est. 2005 · 51-200 staff Unverified Wind · Solar · BESS | Services | DNO areas05/15 | Size500 kW – 69 MW | Score34.4 |
| 04 | Power and Grid Engineering Stoke-on-Trent · est. 2022 · 1-5 staff Unverified Solar · Wind · BESS · Data centre · Industrial | Services | DNO areas14/15 | Size1–100 MW | Score31.6 |
| 05 | DNO Renewables Blyth · est. 2024 · 1-5 staff Unverified Solar · BESS · EV hubs · Industrial · Housing | Services | DNO areas15/15 | Size4 kW – 50 MW | Score30.1 |
| 06 | Blake Clough Consulting Slaithwaite · est. 2021 · 51-200 staff Unverified Wind · Solar · BESS · Data centre | Services | DNO areas00/15 | Size50–110 MW | Score28.9 |
| 07 | UCML Wrexham · est. 2004 · 16-50 staff Unverified Housing · Industrial · Data centre · Solar | Services | DNO areas04/15 | Size350 kW – 3 MW | Score27.6 |
| 08 | Pure Green Consulting Newport · est. 2017 · 6-15 staff Unverified Solar · BESS · Wind | Services | DNO areas01/15 | Size25–600 MW | Score26.7 |
| 09 | SLR Consulting London · est. 1994 · 200+ staff Unverified Wind · Solar · BESS · Data centre · Industrial · EV hubs | Services | DNO areas01/15 | Size1–100 MW | Score25.9 |
| 10 | Aurora Power Consulting Bristol · est. 2007 · 6-15 staff Unverified BESS · Solar · Wind · Data centre · Industrial | Services | DNO areas00/15 | Size10–250 MW | Score25.4 |
| 11 | Fulcrum Sheffield · est. 2005 · 200+ staff Unverified Data centre · Housing · EV hubs · Industrial · Solar | Services | DNO areas02/15 | Size100 kW – 49.9 MW | Score24.9 |
| 12 | TNEI Manchester · est. 1999 · 51-200 staff Unverified Wind · Solar · BESS · Data centre · Industrial | Services | DNO areas00/15 | Size1–200 MW | Score24.5 |
| 13 | Natural Power Castle Douglas · est. 1995 · 200+ staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size5–100 MW | Score22.7 |
| 14 | Decerna Cramlington · est. 2012 · 6-15 staff Unverified Wind · Solar · BESS | Services | DNO areas01/15 | Size3–250 MW | Score22.4 |
| 15 | Engineering Power Solutions Stockton-on-Tees · est. 2012 · 6-15 staff Unverified BESS · Wind · Solar · Data centre · Industrial | Services | DNO areas01/15 | Size2–200 MW | Score19.2 |
| 16 | Action Renewables Belfast · est. 2003 · 1-5 staff Unverified Wind · Solar | Services | DNO areas01/15 | Size50 kW – 10 MW | Score18.6 |
| 16 | Grid Connection Consulting Linlithgow · est. 2007 · 1-5 staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size150 kW – 2000 MW | Score18.6 |
| 18 | ADTEK Newcastle upon Tyne · est. 2012 · 1-5 staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size1–50 MW | Score17.9 |
| 19 | RSK Utility Consulting Ipswich · est. 2018 · 6-15 staff Unverified Wind · BESS · Solar · EV hubs · Housing · Industrial · Data centre | Services | DNO areas02/15 | Size50 kW – 100 MW | Score17.6 |
| 20 | UK Power Engineers London · est. 2013 · 6-15 staff Unverified Solar · BESS · Industrial | Services | DNO areas00/15 | Size10–50 MW | Score17.4 |
| 21 | Locogen Edinburgh · est. 2009 · 16-50 staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size20–110 MW | Score15.8 |
| 22 | Roadnight Taylor Burford · est. 2013 · 16-50 staff Unverified Data centre · BESS · Solar · Wind · Industrial · Housing | Services | DNO areas00/15 | Size1–100 MW | Score15.6 |
| 23 | PSE2 Consulting Bristol · est. 2016 · 6-15 staff Unverified EV hubs · Solar · Wind · BESS · Industrial | Services | DNO areas01/15 | Size1–50 MW | Score15.4 |
| 24 | Artios Energy Edinburgh · est. 2021 · 1-5 staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size1–100 MW | Score15.2 |
| 25 | HZ Power London · est. 2021 · 1-5 staff Unverified Solar · BESS · Data centre | Services | DNO areas00/15 | Size94 kW – 960 MW | Score13.4 |
| 26 | Utility Connections Warrington · est. 2019 · 16-50 staff Unverified Data centre · Industrial · Solar · BESS | Services | DNO areas00/15 | Size100 kW – 20 MW | Score12.6 |
See the full UK rankingGet matched with consultants for solar pv
Solar PV: common questions
Q01What is the difference between G98 and G99 for solar?
G98 covers small type-tested installations, typically up to 16A per phase, and uses a simple connect-and-notify process. Anything larger falls under G99, which requires an application and approval before connection.
Q02Can I connect more solar than the export capacity I have been offered?
Often, yes, by using an export limitation scheme under G100 or by adding on-site storage. The network operator must approve the scheme.
Q03Who decides where a solar farm connects?
The network operator identifies the point of connection in its offer, based on available capacity. A consultant can test alternatives before you apply.