Sector · GCC-S05
Grid connection consultants for EV charging hubs
EV charging hubs, especially rapid and ultra-rapid sites on motorways and in depots, are new demand connections that can need several megawatts. The cost and timescale usually depend on whether the local substation has spare capacity.
- Typical size
- 0.5 MW to 10 MW+
- Typical voltage
- Low voltage to 11 kV; 33 kV for the largest hubs
- Route
- DNO demand connection, often with an ICP
- Timeline
- Driven by local substation capacity and reinforcement needs
Connecting ev charging hubs in the UK
Consultancies in this category help with load assessment, demand applications, ICP delivery of contestable works and phased capacity plans.
Current regulatory issues
- Using an ICP for contestable works can give more control over the programme.
- Flexible or timed connection profiles can reduce reinforcement costs for depots.
Track record counts only projects in this sector.
Best grid connection consultants for ev charging hubs
Ranked by a published formulaMethodology
| Rank | Consultancy | Services | DNO coverage | Typical size | Score |
|---|---|---|---|---|---|
| 01 | EnergyForce Withernsea · est. 2014 · 6-15 staff Unverified EV hubs · Industrial · Solar · BESS | Services | DNO areas14/15 | Size40–250 kW | Score41.9 |
| 02 | SLR Consulting London · est. 1994 · 200+ staff Unverified Wind · Solar · BESS · Data centre · Industrial · EV hubs | Services | DNO areas01/15 | Size1–100 MW | Score30.9 |
| 03 | DNO Renewables Blyth · est. 2024 · 1-5 staff Unverified Solar · BESS · EV hubs · Industrial · Housing | Services | DNO areas15/15 | Size4 kW – 50 MW | Score30.1 |
| 04 | PSE2 Consulting Bristol · est. 2016 · 6-15 staff Unverified EV hubs · Solar · Wind · BESS · Industrial | Services | DNO areas01/15 | Size1–50 MW | Score20.4 |
| 05 | Fulcrum Sheffield · est. 2005 · 200+ staff Unverified Data centre · Housing · EV hubs · Industrial · Solar | Services | DNO areas02/15 | Size100 kW – 49.9 MW | Score19.9 |
| 06 | RSK Utility Consulting Ipswich · est. 2018 · 6-15 staff Unverified Wind · BESS · Solar · EV hubs · Housing · Industrial · Data centre | Services | DNO areas02/15 | Size50 kW – 100 MW | Score17.6 |
See the full UK rankingGet matched with consultants for ev charging hubs
EV charging hubs: common questions
Q01How much capacity does an EV charging hub need?
It depends on the number and power of chargers and how often they run together. Load management can reduce the capacity you need to apply for.
Q02Can an ICP build my EV hub connection?
Yes, an accredited ICP can build the contestable parts of the connection. The DNO still carries out the non-contestable works such as the final connection.
Q03Why is my EV hub connection quote so high?
High quotes usually reflect upstream reinforcement needed to free up capacity. A consultant can test smaller or phased capacity, alternative points of connection or flexible terms.