Industrial and commercial sites need new or increased connections when they expand or electrify heat and transport. Many also add on-site generation or storage, which brings G99 requirements.
- Typical size
- 1 MW to 100 MW
- Typical voltage
- 11 kV to 132 kV
- Route
- DNO demand connection; private wire for adjacent generation
- Timeline
- Dependent on reinforcement and local capacity
Connecting industrial and commercial in the UK
Consultancies in this category handle capacity increases, private wire arrangements, behind-the-meter assets and offer negotiation.
Current regulatory issues
- Electrification of process heat can significantly increase a site's maximum demand.
- Private wire and behind-the-meter generation can reduce the import capacity a site needs.
Track record counts only projects in this sector.
Best grid connection consultants for industrial and commercial
Ranked by a published formulaMethodology
| Rank | Consultancy | Services | DNO coverage | Typical size | Score |
|---|---|---|---|---|---|
| 01 | Power On Connections Coventry · est. 2003 · 200+ staff Unverified Data centre · Industrial · Housing · BESS · Solar · Wind | Services | DNO areas14/15 | Size500 kW – 100 MW | Score50.9 |
| 02 | EnergyForce Withernsea · est. 2014 · 6-15 staff Unverified EV hubs · Industrial · Solar · BESS | Services | DNO areas14/15 | Size40–250 kW | Score31.9 |
| 03 | Power and Grid Engineering Stoke-on-Trent · est. 2022 · 1-5 staff Unverified Solar · Wind · BESS · Data centre · Industrial | Services | DNO areas14/15 | Size1–100 MW | Score31.6 |
| 04 | DNO Renewables Blyth · est. 2024 · 1-5 staff Unverified Solar · BESS · EV hubs · Industrial · Housing | Services | DNO areas15/15 | Size4 kW – 50 MW | Score30.1 |
| 05 | UCML Wrexham · est. 2004 · 16-50 staff Unverified Housing · Industrial · Data centre · Solar | Services | DNO areas04/15 | Size350 kW – 3 MW | Score27.6 |
| 06 | SLR Consulting London · est. 1994 · 200+ staff Unverified Wind · Solar · BESS · Data centre · Industrial · EV hubs | Services | DNO areas01/15 | Size1–100 MW | Score25.9 |
| 07 | TNEI Manchester · est. 1999 · 51-200 staff Unverified Wind · Solar · BESS · Data centre · Industrial | Services | DNO areas00/15 | Size1–200 MW | Score24.5 |
| 08 | Engineering Power Solutions Stockton-on-Tees · est. 2012 · 6-15 staff Unverified BESS · Wind · Solar · Data centre · Industrial | Services | DNO areas01/15 | Size2–200 MW | Score24.2 |
| 09 | Aurora Power Consulting Bristol · est. 2007 · 6-15 staff Unverified BESS · Solar · Wind · Data centre · Industrial | Services | DNO areas00/15 | Size10–250 MW | Score20.4 |
| 10 | Connectus Utilities Leicester · est. 2023 · 6-15 staff Unverified Housing · Industrial · Data centre | Services | DNO areas02/15 | Size50 kW – 2 MW | Score20.1 |
| 11 | Fulcrum Sheffield · est. 2005 · 200+ staff Unverified Data centre · Housing · EV hubs · Industrial · Solar | Services | DNO areas02/15 | Size100 kW – 49.9 MW | Score19.9 |
| 12 | RSK Utility Consulting Ipswich · est. 2018 · 6-15 staff Unverified Wind · BESS · Solar · EV hubs · Housing · Industrial · Data centre | Services | DNO areas02/15 | Size50 kW – 100 MW | Score17.6 |
| 13 | UK Power Engineers London · est. 2013 · 6-15 staff Unverified Solar · BESS · Industrial | Services | DNO areas00/15 | Size10–50 MW | Score17.4 |
| 14 | Roadnight Taylor Burford · est. 2013 · 16-50 staff Unverified Data centre · BESS · Solar · Wind · Industrial · Housing | Services | DNO areas00/15 | Size1–100 MW | Score15.6 |
| 15 | PSE2 Consulting Bristol · est. 2016 · 6-15 staff Unverified EV hubs · Solar · Wind · BESS · Industrial | Services | DNO areas01/15 | Size1–50 MW | Score15.4 |
| 16 | Utility Connections Warrington · est. 2019 · 16-50 staff Unverified Data centre · Industrial · Solar · BESS | Services | DNO areas00/15 | Size100 kW – 20 MW | Score12.6 |
| 17 | Star Delta Power Holmfirth · est. 2018 · 1-5 staff Unverified BESS · Industrial | Services | DNO areas02/15 | Size48.8–200 MW | Score12.1 |
| 18 | Utility Source Rotherham · est. 2018 · 6-15 staff Unverified Housing · Industrial | Services | DNO areas00/15 | Size10 kW – 1 MW | Score9.5 |
See the full UK rankingGet matched with consultants for industrial and commercial
Industrial and commercial: common questions
Q01How do I increase my site's grid capacity?
You apply to your DNO for an increase in agreed capacity. The DNO will assess whether the network can supply it and quote for any works needed.
Q02What is a private wire arrangement?
A direct connection between a generator and a consumer that does not use the public network, such as a solar farm supplying an adjacent factory.
Q03Does adding solar or batteries affect my connection?
Yes. On-site generation or storage needs approval under G98 or G99, and may need export limitation if the network cannot accept full export.