Consultancy profile · GCC-C04
Aurora Power Consulting
Bristol-based power systems consultancy, part of morsonPRAXIS, that carries out G99 and Grid Code compliance studies, load flow, fault level, harmonic, EMT, protection and earthing studies, and supports the technical dialogue with DNOs and NESO during connection.
- Overall rank
- 04 of 32
- Score
- 50.4
- Headquarters
- Bristol
- Founded
- 2007
- Team
- 6-15 staff
- Typical size
- 10–250 MW
- Status
- Unverified · seen 07 Nov 2026
Ranked by a published formulaMethodology
§01Services
Services offered
6 of our 11 service lines. Legal advice is outside the scope of this directory.
- FSFeasibility and grid capacity studies(offered)
- CAConnection applications(not offered)
- TXNESO / transmission connections(offered)
- DXDNO / distribution connections(offered)
- G9G99 / G100 compliance(offered)
- ORConnection offer review(not offered)
- QMQueue management and Gate 2(not offered)
- PWPrivate wire and behind-the-meter(offered)
- ICICP / IDNO delivery(not offered)
- PSPower systems studies(offered)
- PLPlanning support(not offered)
§02Sectors
§03Coverage
Regions and network areas
Regions served
- Scotland
- North East England
- North West England
- Yorkshire and the Humber
- East Midlands
- West Midlands
- Wales
- East of England
- London
- South East England
- South West England
- Northern Ireland
DNO licence areas worked in (0/15)
- SHEPDSSEN
- SPDSPEN
- NPgNNPg
- ENWLSPEN
- SPMSPEN
- NPgYNPg
- SWALESNGED
- WMIDNGED
- EMIDNGED
- EPNUKPN
- SWESTNGED
- SEPDSSEN
- LPNUKPN
- SPNUKPN
- NIENIE
§04Projects
Notable projects
| Project | Sector | Capacity | Year | Location |
|---|---|---|---|---|
| Stoneshollow, Doverdale and Langford hybrid solar and battery sitesRole: G99 Type D, P28, G5/5 and cable sizing study packages for 132 kV connections | Solar | — | — | — |
| Indian Queens BESSRole: Grid Code compliance, protection and PSCAD SSO studies | BESS | 50 MW | — | Indian Queens |
| Coylton BESSRole: Grid-forming compliance, fault level, protection and earthing studies | BESS | 50 MW | — | — |
| Akira BESSRole: Grid Code compliance and protection coordination | BESS | 57 MW | — | — |
| Sanquhar II Wind FarmRole: Grid Code compliance, insulation coordination and earthing studies | Wind | 250 MW | — | — |
| Pines Burn Wind FarmRole: Grid Code compliance, SSO study and earthing | Wind | 49 MW | — | — |
As stated by the firm.
§05Credentials
Accreditations
None listed.
Contact
- Website
- aurora-power.co.uk
- Phone
- 0117 2990 300
- Address
- Bristol and Bath Science Park, Dirac Crescent, Bristol
- HQ
- Bristol
§06Score
How this firm scores
Ranked by a published formulaMethodology
50.4out of 100 · rank 04
- Track record
- 30.0/30
- Service breadth
- 10.9/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 9.5/10
§07Corrections
Is this your firm?
Claim the profile to update details and submit evidence for verification. Claiming is free.
Report an error on this page
Profile last checked 07 Nov 2026 · Other regions: