Best grid connection consultants in the UK (2026), ranked
32 UK consultancies that secure electricity grid connections, ranked by one published formula. Scores use only listing data we can check: documented projects, services, network coverage, verification and years trading.
Ranked by a published formulaMethodology
- Listed
- 32
- Verified
- 00
- Data checked
- 07 Nov 2026
- Dwg no.
- GCC-100
Ties share a rank. Featured listings are labelled.
The 2026 ranking
Ranked by a published formulaMethodology
- 01
Green Cat Renewables
Biggar · est. 2005 · 500 kW – 69 MW
Scottish renewable energy consultancy based in Biggar that supports wind, solar, hydro and hybrid projects from feasibility to operation. Its grid team prepares connection applications, reviews connection agreements, liaises with network operators and models network constraints for distribution and transmission connections.
Score59.4
- Track record
- 30.0/30
- Service breadth
- 12.7/20
- Network coverage
- 6.7/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 02
Power On Connections
Coventry · est. 2003 · 500 kW – 100 MW
Coventry-headquartered NERS-accredited ICP within the BUUK Infrastructure group that provides feasibility, design, build and IDNO adoption of grid connections up to 132kV for data centres, commercial, residential and renewable projects.
Score55.9
- Track record
- 20.0/30
- Service breadth
- 7.3/20
- Network coverage
- 18.7/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 03
UCML
Wrexham · est. 2004 · 350 kW – 3 MW
Wrexham-based utility connections consultancy that investigates, negotiates and project-manages electricity, gas, water and telecoms connections, disconnections and diversions for housing, commercial and industrial developments, acting as the client's single point of contact with network operators.
UnverifiedHousingIndustrialData centreSolar
Score52.6
- Track record
- 30.0/30
- Service breadth
- 7.3/20
- Network coverage
- 5.3/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 04
Aurora Power Consulting
Bristol · est. 2007 · 10–250 MW
Bristol-based power systems consultancy, part of morsonPRAXIS, that carries out G99 and Grid Code compliance studies, load flow, fault level, harmonic, EMT, protection and earthing studies, and supports the technical dialogue with DNOs and NESO during connection.
UnverifiedBESSSolarWindData centreIndustrial
Score50.4
- Track record
- 30.0/30
- Service breadth
- 10.9/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 9.5/10
- 05
EnergyForce
Withernsea · est. 2014 · 40–250 kW
East Yorkshire company and NERS-accredited ICP that offers grid connection consultancy (capacity assessments, connection point identification and challenge of DNO reinforcement assumptions) alongside design and installation of EV charging, solar PV and battery storage for commercial sites.
UnverifiedEV hubsIndustrialSolarBESS
Score46.9
- Track record
- 15.0/30
- Service breadth
- 7.3/20
- Network coverage
- 18.7/20
- Verification
- 0.0/20
- Experience
- 6.0/10
- 06
Blake Clough Consulting
Slaithwaite · est. 2021 · 50–110 MW
Electricity networks consultancy headquartered in West Yorkshire that provides power systems analysis, G99/G100 and transmission connection applications, grid feasibility and curtailment studies, offer due diligence and substation layout design. Part of the H&MV Engineering group.
UnverifiedWindSolarBESSData centre
Score43.9
- Track record
- 25.0/30
- Service breadth
- 16.4/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 2.5/10
- 07
Fulcrum
Sheffield · est. 2005 · 100 kW – 49.9 MW
Sheffield-based multi-utility connections provider, ICP and IDNO whose services for data centre, housing, EV and commercial developers include feasibility, point of connection and route optimisation ahead of in-house design and delivery.
UnverifiedData centreHousingEV hubsIndustrialSolar
Score39.9
- Track record
- 20.0/30
- Service breadth
- 7.3/20
- Network coverage
- 2.7/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 08
TNEI
Manchester · est. 1999 · 1–200 MW
Manchester-based energy consultancy whose connections team carries out power system studies, G99 and Grid Code compliance work, connection applications and offer reviews for distribution and transmission projects. It also develops the IPSA power systems software and offers planning and consenting services.
UnverifiedWindSolarBESSData centreIndustrial
Score39.5
- Track record
- 15.0/30
- Service breadth
- 14.5/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 09
Pure Green Consulting
Newport · est. 2017 · 25–600 MW
Newport-based technical advisory firm for utility-scale solar, battery storage and wind projects, offering owner's engineer, due diligence and project delivery support. Its grid advisory covers connection strategy and feasibility, applications, DNO and National Grid coordination, and review of connection offers.
Score36.7
- Track record
- 20.0/30
- Service breadth
- 10.9/20
- Network coverage
- 1.3/20
- Verification
- 0.0/20
- Experience
- 4.5/10
- 10
SLR Consulting
London · est. 1994 · 1–100 MW
Multidisciplinary environmental and engineering consultancy whose Power Networks team assesses grid connection pathways, prepares connection applications, reviews connection offers and agreements, and carries out power system studies for renewable, storage, data centre and industrial projects.
Score35.9
- Track record
- 10.0/30
- Service breadth
- 14.5/20
- Network coverage
- 1.3/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 11
Engineering Power Solutions
Stockton-on-Tees · est. 2012 · 2–200 MW
Electrical engineering consultancy based in Stockton-on-Tees that provides G99 and Grid Code compliance studies, connection applications, connection cost calculations and offer reviews, alongside power system studies, earthing and protection work for 11 kV to 400 kV connections.
UnverifiedBESSWindSolarData centreIndustrial
Score34.2
- Track record
- 15.0/30
- Service breadth
- 10.9/20
- Network coverage
- 1.3/20
- Verification
- 0.0/20
- Experience
- 7.0/10
- 12
Grid Connection Consulting
Linlithgow · est. 2007 · 150 kW – 2000 MW
Small specialist consultancy near Edinburgh that has handled grid connection applications, electrical design and Grid Code advice for generation projects since 2007. It reports more than 700 applications for sites from 150 kW to 2 GW, mainly wind, and has acted as lead grid or power systems engineer on large offshore wind farms.
Score33.6
- Track record
- 15.0/30
- Service breadth
- 9.1/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 9.5/10
- 13
RSK Utility Consulting
Ipswich · est. 2018 · 50 kW – 100 MW
Suffolk-based utility and grid consultancy, part of RSK Group and formerly Certus Utility Consulting, that manages DNO and transmission connection applications, capacity studies, connection offer reviews and ICP/IDNO procurement for renewable, storage, EV, housing and commercial developments.
Score32.6
- Track record
- 15.0/30
- Service breadth
- 10.9/20
- Network coverage
- 2.7/20
- Verification
- 0.0/20
- Experience
- 4.0/10
- 14
Power and Grid Engineering
Stoke-on-Trent · est. 2022 · 1–100 MW
Small power system design and grid consultancy that prepares G99 and BELLA applications, PGDM and DRC compliance documents, feasibility and constraint studies, and manages connection processes with DNOs, NGET and NESO.
UnverifiedSolarWindBESSData centreIndustrial
Score31.6
- Track record
- 0.0/30
- Service breadth
- 10.9/20
- Network coverage
- 18.7/20
- Verification
- 0.0/20
- Experience
- 2.0/10
- 15
Connectus Utilities
Leicester · est. 2023 · 50 kW – 2 MW
Leicester-based utility consultancy, part of The Consultus Group, that coordinates new connections, upgrades, diversions, HV substation projects and G99/G100 applications, tendering DNO, ICP and IDNO quotations for residential, commercial and industrial developments.
UnverifiedHousingIndustrialData centre
Score30.1
- Track record
- 15.0/30
- Service breadth
- 10.9/20
- Network coverage
- 2.7/20
- Verification
- 0.0/20
- Experience
- 1.5/10
- 15
DNO Renewables
Blyth · est. 2024 · 4 kW – 50 MW
Northumberland-registered firm, set up in 2024, that prepares G98 and G99 applications, new connection and upgrade requests, feasibility studies and connection offer reviews, mainly for solar, battery, heat pump and EV installers and developers.
UnverifiedSolarBESSEV hubsIndustrialHousing
Score30.1
- Track record
- 0.0/30
- Service breadth
- 9.1/20
- Network coverage
- 20.0/20
- Verification
- 0.0/20
- Experience
- 1.0/10
- 17
Natural Power
Castle Douglas · est. 1995 · 5–100 MW
Renewable energy consultancy headquartered in Castle Douglas, Dumfries and Galloway, working across wind, solar, storage and grid infrastructure. Its grid services team covers connection feasibility and applications, offer and curtailment review, G99/G100 compliance and co-location or behind-the-meter options.
Score27.7
- Track record
- 5.0/30
- Service breadth
- 12.7/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 18
Decerna
Cramlington · est. 2012 · 3–250 MW
Northumberland-based energy consultancy, formerly Narec Distributed Energy, whose grid-scale renewables and storage work includes budget enquiries, G99 and G100 applications, National Grid pre-applications and grid connection assessments for wind, solar and battery projects.
Score27.4
- Track record
- 10.0/30
- Service breadth
- 9.1/20
- Network coverage
- 1.3/20
- Verification
- 0.0/20
- Experience
- 7.0/10
- 19
Star Delta Power
Holmfirth · est. 2018 · 48.8–200 MW
Chartered-engineer-led consultancy in West Yorkshire focused on UK grid connections, providing G99 Type C and D compliance packages, protection studies and relay settings, P28 and G5/5 studies, cable system design and independent design assurance.
UnverifiedBESSIndustrial
Score27.1
- Track record
- 15.0/30
- Service breadth
- 5.5/20
- Network coverage
- 2.7/20
- Verification
- 0.0/20
- Experience
- 4.0/10
- 20
PSE2 Consulting
Bristol · est. 2016 · 1–50 MW
Power systems consultancy with offices in Bristol and Cardiff that runs grid connection studies (harmonics, flicker, fault infeed, stability), supports ENA connection applications and DNO liaison, and provides electrical design, earthing and arc flash services.
UnverifiedEV hubsSolarWindBESSIndustrial
Score25.4
- Track record
- 10.0/30
- Service breadth
- 9.1/20
- Network coverage
- 1.3/20
- Verification
- 0.0/20
- Experience
- 5.0/10
- 21
ADTEK
Newcastle upon Tyne · est. 2012 · 1–50 MW
Newcastle-based renewable energy technical consultancy offering grid connection site assessments, feasibility studies, connection applications and connection offer reviews, alongside power system studies for wind, solar, hydro and battery storage projects.
Score22.9
- Track record
- 5.0/30
- Service breadth
- 10.9/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 7.0/10
- 22
Rapleys
Huntingdon · est. 2004 · 100 kW – 5 MW
National property consultancy whose utilities consultancy team handles constraint reporting, site load calculations, point of connection applications and competing DNO, ICP and IDNO quotations for land and housing development projects.
UnverifiedHousing
Score22.3
- Track record
- 5.0/30
- Service breadth
- 7.3/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 23
Action Renewables
Belfast · est. 2003 · 50 kW – 10 MW
Belfast-based charity and energy trading organisation that runs a grid connection service for generators in Northern Ireland. It checks capacity, prepares and submits G99/NI and G98/NI applications with single line diagrams to NIE Networks, answers network operator queries and advises on compliance and turbine repowering.
Score18.6
- Track record
- 0.0/30
- Service breadth
- 7.3/20
- Network coverage
- 1.3/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 24
UK Power Engineers
London · est. 2013 · 10–50 MW
London and Reading-based power engineering consultancy that, alongside network design work, supports renewable developers with ENA G99 connection applications, DNO liaison, connection offer reviews and cost analysis for solar, battery and generation schemes connecting at 33kV to 132kV.
UnverifiedSolarBESSIndustrial
Score17.4
- Track record
- 0.0/30
- Service breadth
- 10.9/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 6.5/10
- 25
Locogen
Edinburgh · est. 2009 · 20–110 MW
Edinburgh renewable energy consultancy working on onshore wind, ground-mounted solar and battery storage across the UK. Alongside planning, environmental and owner's engineer work, it supports grid connection applications, connection strategy and Gate 2 submissions under the reformed connections process.
Score15.8
- Track record
- 0.0/30
- Service breadth
- 7.3/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 8.5/10
- 26
Roadnight Taylor
Burford · est. 2013 · 1–100 MW
Oxfordshire-based grid consultancy that advises developers, investors, data centre operators, industrial users and public bodies on electricity network connections, covering feasibility, applications, connection offer review, Grid Code compliance and acquisition due diligence.
Score15.6
- Track record
- 0.0/30
- Service breadth
- 9.1/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 6.5/10
- 27
EA Technology
Chester · est. 1990 · 100 kW – 50 MW
Chester-based power engineering and asset management company whose network studies team carries out ENA G99 Grid Code compliance studies for generation and storage connecting to distribution networks, alongside load flow, fault level and protection studies.
UnverifiedBESS
Score15.5
- Track record
- 0.0/30
- Service breadth
- 5.5/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 10.0/10
- 28
TriConnex
Braintree · est. 2010 · 100 kW – 12 MW
Braintree-based multi-utility connections provider for residential developers. Its feasibility studies and Grid Dynamix service assess loads, secure and track electricity capacity applications, and it designs and builds networks as a NERS-accredited ICP.
UnverifiedHousing
Score15.3
- Track record
- 0.0/30
- Service breadth
- 7.3/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 8.0/10
- 29
Artios Energy
Edinburgh · est. 2021 · 1–100 MW
Edinburgh-based consultancy focused on electrical connections for renewable generation, covering wind, solar, battery storage and small hydro. Services include grid feasibility, connection applications, offer review, G99 and Grid Code compliance, curtailment assessment and power system studies.
Score15.2
- Track record
- 0.0/30
- Service breadth
- 12.7/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 2.5/10
- 30
HZ Power
London · est. 2021 · 94 kW – 960 MW
London-registered engineering consultancy offering grid applications, grid origination, feasibility, curtailment analysis and connection due diligence, plus power system studies including G99 compliance, G5/5 harmonics, P28, load flow and earthing.
UnverifiedSolarBESSData centre
Score13.4
- Track record
- 0.0/30
- Service breadth
- 10.9/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 2.5/10
- 31
Utility Connections
Warrington · est. 2019 · 100 kW – 20 MW
Daresbury-based multi-utility consultancy, part of the UIG Group, offering feasibility studies, load assessments, point of connection applications and challenges to reinforcement costs for data centre, industrial, logistics and commercial developments across the UK.
UnverifiedData centreIndustrialSolarBESS
Score12.6
- Track record
- 0.0/30
- Service breadth
- 9.1/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 3.5/10
- 32
Utility Source
Rotherham · est. 2018 · 10 kW – 1 MW
Small South Yorkshire utilities consultancy founded in 2018 that advises property developers and investors on electricity, gas, water and telecoms connections, including DNO and ICP liaison, new supplies and substation requirements, from pre-acquisition to handover.
UnverifiedHousingIndustrial
Score9.5
- Track record
- 0.0/30
- Service breadth
- 5.5/20
- Network coverage
- 0.0/20
- Verification
- 0.0/20
- Experience
- 4.0/10
Service key
- FS
- Feasibility and grid capacity studies
- CA
- Connection applications
- TX
- NESO / transmission connections
- DX
- DNO / distribution connections
- G9
- G99 / G100 compliance
- OR
- Connection offer review
- QM
- Queue management and Gate 2
- PW
- Private wire and behind-the-meter
- IC
- ICP / IDNO delivery
- PS
- Power systems studies
- PL
- Planning support
Compare by sector, region and service
Ranked by a published formulaMethodology
Showing 32 of 32
| Rank | Consultancy | Services | DNO coverage | Typical size | Score |
|---|---|---|---|---|---|
| 01 | Green Cat Renewables Biggar · est. 2005 · 51-200 staff Unverified Wind · Solar · BESS | Services | DNO areas05/15 | Size500 kW – 69 MW | Score59.4 |
| 02 | Power On Connections Coventry · est. 2003 · 200+ staff Unverified Data centre · Industrial · Housing · BESS · Solar · Wind | Services | DNO areas14/15 | Size500 kW – 100 MW | Score55.9 |
| 03 | UCML Wrexham · est. 2004 · 16-50 staff Unverified Housing · Industrial · Data centre · Solar | Services | DNO areas04/15 | Size350 kW – 3 MW | Score52.6 |
| 04 | Aurora Power Consulting Bristol · est. 2007 · 6-15 staff Unverified BESS · Solar · Wind · Data centre · Industrial | Services | DNO areas00/15 | Size10–250 MW | Score50.4 |
| 05 | EnergyForce Withernsea · est. 2014 · 6-15 staff Unverified EV hubs · Industrial · Solar · BESS | Services | DNO areas14/15 | Size40–250 kW | Score46.9 |
| 06 | Blake Clough Consulting Slaithwaite · est. 2021 · 51-200 staff Unverified Wind · Solar · BESS · Data centre | Services | DNO areas00/15 | Size50–110 MW | Score43.9 |
| 07 | Fulcrum Sheffield · est. 2005 · 200+ staff Unverified Data centre · Housing · EV hubs · Industrial · Solar | Services | DNO areas02/15 | Size100 kW – 49.9 MW | Score39.9 |
| 08 | TNEI Manchester · est. 1999 · 51-200 staff Unverified Wind · Solar · BESS · Data centre · Industrial | Services | DNO areas00/15 | Size1–200 MW | Score39.5 |
| 09 | Pure Green Consulting Newport · est. 2017 · 6-15 staff Unverified Solar · BESS · Wind | Services | DNO areas01/15 | Size25–600 MW | Score36.7 |
| 10 | SLR Consulting London · est. 1994 · 200+ staff Unverified Wind · Solar · BESS · Data centre · Industrial · EV hubs | Services | DNO areas01/15 | Size1–100 MW | Score35.9 |
| 11 | Engineering Power Solutions Stockton-on-Tees · est. 2012 · 6-15 staff Unverified BESS · Wind · Solar · Data centre · Industrial | Services | DNO areas01/15 | Size2–200 MW | Score34.2 |
| 12 | Grid Connection Consulting Linlithgow · est. 2007 · 1-5 staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size150 kW – 2000 MW | Score33.6 |
| 13 | RSK Utility Consulting Ipswich · est. 2018 · 6-15 staff Unverified Wind · BESS · Solar · EV hubs · Housing · Industrial · Data centre | Services | DNO areas02/15 | Size50 kW – 100 MW | Score32.6 |
| 14 | Power and Grid Engineering Stoke-on-Trent · est. 2022 · 1-5 staff Unverified Solar · Wind · BESS · Data centre · Industrial | Services | DNO areas14/15 | Size1–100 MW | Score31.6 |
| 15 | Connectus Utilities Leicester · est. 2023 · 6-15 staff Unverified Housing · Industrial · Data centre | Services | DNO areas02/15 | Size50 kW – 2 MW | Score30.1 |
| 15 | DNO Renewables Blyth · est. 2024 · 1-5 staff Unverified Solar · BESS · EV hubs · Industrial · Housing | Services | DNO areas15/15 | Size4 kW – 50 MW | Score30.1 |
| 17 | Natural Power Castle Douglas · est. 1995 · 200+ staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size5–100 MW | Score27.7 |
| 18 | Decerna Cramlington · est. 2012 · 6-15 staff Unverified Wind · Solar · BESS | Services | DNO areas01/15 | Size3–250 MW | Score27.4 |
| 19 | Star Delta Power Holmfirth · est. 2018 · 1-5 staff Unverified BESS · Industrial | Services | DNO areas02/15 | Size48.8–200 MW | Score27.1 |
| 20 | PSE2 Consulting Bristol · est. 2016 · 6-15 staff Unverified EV hubs · Solar · Wind · BESS · Industrial | Services | DNO areas01/15 | Size1–50 MW | Score25.4 |
| 21 | ADTEK Newcastle upon Tyne · est. 2012 · 1-5 staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size1–50 MW | Score22.9 |
| 22 | Rapleys Huntingdon · est. 2004 · 51-200 staff Unverified Housing | Services | DNO areas00/15 | Size100 kW – 5 MW | Score22.3 |
| 23 | Action Renewables Belfast · est. 2003 · 1-5 staff Unverified Wind · Solar | Services | DNO areas01/15 | Size50 kW – 10 MW | Score18.6 |
| 24 | UK Power Engineers London · est. 2013 · 6-15 staff Unverified Solar · BESS · Industrial | Services | DNO areas00/15 | Size10–50 MW | Score17.4 |
| 25 | Locogen Edinburgh · est. 2009 · 16-50 staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size20–110 MW | Score15.8 |
| 26 | Roadnight Taylor Burford · est. 2013 · 16-50 staff Unverified Data centre · BESS · Solar · Wind · Industrial · Housing | Services | DNO areas00/15 | Size1–100 MW | Score15.6 |
| 27 | EA Technology Chester · est. 1990 · 51-200 staff Unverified BESS | Services | DNO areas00/15 | Size100 kW – 50 MW | Score15.5 |
| 28 | TriConnex Braintree · est. 2010 · 200+ staff Unverified Housing | Services | DNO areas00/15 | Size100 kW – 12 MW | Score15.3 |
| 29 | Artios Energy Edinburgh · est. 2021 · 1-5 staff Unverified Wind · Solar · BESS | Services | DNO areas00/15 | Size1–100 MW | Score15.2 |
| 30 | HZ Power London · est. 2021 · 1-5 staff Unverified Solar · BESS · Data centre | Services | DNO areas00/15 | Size94 kW – 960 MW | Score13.4 |
| 31 | Utility Connections Warrington · est. 2019 · 16-50 staff Unverified Data centre · Industrial · Solar · BESS | Services | DNO areas00/15 | Size100 kW – 20 MW | Score12.6 |
| 32 | Utility Source Rotherham · est. 2018 · 6-15 staff Unverified Housing · Industrial | Services | DNO areas00/15 | Size10 kW – 1 MW | Score9.5 |
Frequently asked questions
Q01What does a grid connection consultant do?
A grid connection consultant helps a project get connected to the electricity network on workable terms. Typical work includes assessing capacity at candidate sites, preparing applications to the DNO or NESO, reviewing and negotiating connection offers, managing queue position, and commissioning technical studies.
Q02How is this ranking calculated?
Every listed consultancy is scored with the same published formula covering track record, service breadth, network coverage, verification and experience. The weights and rules are on the How we rank page.
Q03Do I need a consultant to apply for a grid connection?
No. Anyone can apply directly to a DNO or to NESO. Developers use consultants to save time, avoid costly mistakes in applications, and get a second opinion on the terms and cost in a connection offer.
Q04How are grid connection consultants paid?
Common models include fixed fees for feasibility studies and applications, day rates for advisory work and, occasionally, success-related fees. Ask for a written scope before you commit.
Q05What is the difference between a DNO and a transmission connection?
Distribution connections are made to the local network operator (the DNO), typically up to 132 kV in England and Wales. Transmission connections are made to the high-voltage network and are applied for through NESO in Great Britain or SONI in Northern Ireland.