Edition 2026 · Ranked list

Best grid connection consultants in the UK (2026), ranked

32 UK consultancies that secure electricity grid connections, ranked by one published formula. Scores use only listing data we can check: documented projects, services, network coverage, verification and years trading.

Ranked by a published formulaMethodology

Have a project? Get matched with up to 3 consultancies

Listed
32
Verified
00
Data checked
07 Nov 2026
Dwg no.
GCC-100
§01The ranking

Ties share a rank. Featured listings are labelled.

The 2026 ranking

Ranked by a published formulaMethodology

  1. 01

    Green Cat Renewables

    Biggar · est. 2005 · 500 kW – 69 MW

    Scottish renewable energy consultancy based in Biggar that supports wind, solar, hydro and hybrid projects from feasibility to operation. Its grid team prepares connection applications, reviews connection agreements, liaises with network operators and models network constraints for distribution and transmission connections.

    UnverifiedWindSolarBESS

    Score59.4

    Track record
    30.0/30
    Service breadth
    12.7/20
    Network coverage
    6.7/20
    Verification
    0.0/20
    Experience
    10.0/10
  2. 02

    Power On Connections

    Coventry · est. 2003 · 500 kW – 100 MW

    Coventry-headquartered NERS-accredited ICP within the BUUK Infrastructure group that provides feasibility, design, build and IDNO adoption of grid connections up to 132kV for data centres, commercial, residential and renewable projects.

    UnverifiedData centreIndustrialHousingBESSSolarWind

    Score55.9

    Track record
    20.0/30
    Service breadth
    7.3/20
    Network coverage
    18.7/20
    Verification
    0.0/20
    Experience
    10.0/10
  3. 03

    UCML

    Wrexham · est. 2004 · 350 kW – 3 MW

    Wrexham-based utility connections consultancy that investigates, negotiates and project-manages electricity, gas, water and telecoms connections, disconnections and diversions for housing, commercial and industrial developments, acting as the client's single point of contact with network operators.

    UnverifiedHousingIndustrialData centreSolar

    Score52.6

    Track record
    30.0/30
    Service breadth
    7.3/20
    Network coverage
    5.3/20
    Verification
    0.0/20
    Experience
    10.0/10
  4. 04

    Aurora Power Consulting

    Bristol · est. 2007 · 10–250 MW

    Bristol-based power systems consultancy, part of morsonPRAXIS, that carries out G99 and Grid Code compliance studies, load flow, fault level, harmonic, EMT, protection and earthing studies, and supports the technical dialogue with DNOs and NESO during connection.

    UnverifiedBESSSolarWindData centreIndustrial

    Score50.4

    Track record
    30.0/30
    Service breadth
    10.9/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    9.5/10
  5. 05

    EnergyForce

    Withernsea · est. 2014 · 40–250 kW

    East Yorkshire company and NERS-accredited ICP that offers grid connection consultancy (capacity assessments, connection point identification and challenge of DNO reinforcement assumptions) alongside design and installation of EV charging, solar PV and battery storage for commercial sites.

    UnverifiedEV hubsIndustrialSolarBESS

    Score46.9

    Track record
    15.0/30
    Service breadth
    7.3/20
    Network coverage
    18.7/20
    Verification
    0.0/20
    Experience
    6.0/10
  6. 06

    Blake Clough Consulting

    Slaithwaite · est. 2021 · 50–110 MW

    Electricity networks consultancy headquartered in West Yorkshire that provides power systems analysis, G99/G100 and transmission connection applications, grid feasibility and curtailment studies, offer due diligence and substation layout design. Part of the H&MV Engineering group.

    UnverifiedWindSolarBESSData centre

    Score43.9

    Track record
    25.0/30
    Service breadth
    16.4/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    2.5/10
  7. 07

    Fulcrum

    Sheffield · est. 2005 · 100 kW – 49.9 MW

    Sheffield-based multi-utility connections provider, ICP and IDNO whose services for data centre, housing, EV and commercial developers include feasibility, point of connection and route optimisation ahead of in-house design and delivery.

    UnverifiedData centreHousingEV hubsIndustrialSolar

    Score39.9

    Track record
    20.0/30
    Service breadth
    7.3/20
    Network coverage
    2.7/20
    Verification
    0.0/20
    Experience
    10.0/10
  8. 08

    TNEI

    Manchester · est. 1999 · 1–200 MW

    Manchester-based energy consultancy whose connections team carries out power system studies, G99 and Grid Code compliance work, connection applications and offer reviews for distribution and transmission projects. It also develops the IPSA power systems software and offers planning and consenting services.

    UnverifiedWindSolarBESSData centreIndustrial

    Score39.5

    Track record
    15.0/30
    Service breadth
    14.5/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    10.0/10
  9. 09

    Pure Green Consulting

    Newport · est. 2017 · 25–600 MW

    Newport-based technical advisory firm for utility-scale solar, battery storage and wind projects, offering owner's engineer, due diligence and project delivery support. Its grid advisory covers connection strategy and feasibility, applications, DNO and National Grid coordination, and review of connection offers.

    UnverifiedSolarBESSWind

    Score36.7

    Track record
    20.0/30
    Service breadth
    10.9/20
    Network coverage
    1.3/20
    Verification
    0.0/20
    Experience
    4.5/10
  10. 10

    SLR Consulting

    London · est. 1994 · 1–100 MW

    Multidisciplinary environmental and engineering consultancy whose Power Networks team assesses grid connection pathways, prepares connection applications, reviews connection offers and agreements, and carries out power system studies for renewable, storage, data centre and industrial projects.

    UnverifiedWindSolarBESSData centreIndustrialEV hubs

    Score35.9

    Track record
    10.0/30
    Service breadth
    14.5/20
    Network coverage
    1.3/20
    Verification
    0.0/20
    Experience
    10.0/10
  11. 11

    Engineering Power Solutions

    Stockton-on-Tees · est. 2012 · 2–200 MW

    Electrical engineering consultancy based in Stockton-on-Tees that provides G99 and Grid Code compliance studies, connection applications, connection cost calculations and offer reviews, alongside power system studies, earthing and protection work for 11 kV to 400 kV connections.

    UnverifiedBESSWindSolarData centreIndustrial

    Score34.2

    Track record
    15.0/30
    Service breadth
    10.9/20
    Network coverage
    1.3/20
    Verification
    0.0/20
    Experience
    7.0/10
  12. 12

    Grid Connection Consulting

    Linlithgow · est. 2007 · 150 kW – 2000 MW

    Small specialist consultancy near Edinburgh that has handled grid connection applications, electrical design and Grid Code advice for generation projects since 2007. It reports more than 700 applications for sites from 150 kW to 2 GW, mainly wind, and has acted as lead grid or power systems engineer on large offshore wind farms.

    UnverifiedWindSolarBESS

    Score33.6

    Track record
    15.0/30
    Service breadth
    9.1/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    9.5/10
  13. 13

    RSK Utility Consulting

    Ipswich · est. 2018 · 50 kW – 100 MW

    Suffolk-based utility and grid consultancy, part of RSK Group and formerly Certus Utility Consulting, that manages DNO and transmission connection applications, capacity studies, connection offer reviews and ICP/IDNO procurement for renewable, storage, EV, housing and commercial developments.

    UnverifiedWindBESSSolarEV hubsHousingIndustrialData centre

    Score32.6

    Track record
    15.0/30
    Service breadth
    10.9/20
    Network coverage
    2.7/20
    Verification
    0.0/20
    Experience
    4.0/10
  14. 14

    Power and Grid Engineering

    Stoke-on-Trent · est. 2022 · 1–100 MW

    Small power system design and grid consultancy that prepares G99 and BELLA applications, PGDM and DRC compliance documents, feasibility and constraint studies, and manages connection processes with DNOs, NGET and NESO.

    UnverifiedSolarWindBESSData centreIndustrial

    Score31.6

    Track record
    0.0/30
    Service breadth
    10.9/20
    Network coverage
    18.7/20
    Verification
    0.0/20
    Experience
    2.0/10
  15. 15

    Connectus Utilities

    Leicester · est. 2023 · 50 kW – 2 MW

    Leicester-based utility consultancy, part of The Consultus Group, that coordinates new connections, upgrades, diversions, HV substation projects and G99/G100 applications, tendering DNO, ICP and IDNO quotations for residential, commercial and industrial developments.

    UnverifiedHousingIndustrialData centre

    Score30.1

    Track record
    15.0/30
    Service breadth
    10.9/20
    Network coverage
    2.7/20
    Verification
    0.0/20
    Experience
    1.5/10
  16. 15

    DNO Renewables

    Blyth · est. 2024 · 4 kW – 50 MW

    Northumberland-registered firm, set up in 2024, that prepares G98 and G99 applications, new connection and upgrade requests, feasibility studies and connection offer reviews, mainly for solar, battery, heat pump and EV installers and developers.

    UnverifiedSolarBESSEV hubsIndustrialHousing

    Score30.1

    Track record
    0.0/30
    Service breadth
    9.1/20
    Network coverage
    20.0/20
    Verification
    0.0/20
    Experience
    1.0/10
  17. 17

    Natural Power

    Castle Douglas · est. 1995 · 5–100 MW

    Renewable energy consultancy headquartered in Castle Douglas, Dumfries and Galloway, working across wind, solar, storage and grid infrastructure. Its grid services team covers connection feasibility and applications, offer and curtailment review, G99/G100 compliance and co-location or behind-the-meter options.

    UnverifiedWindSolarBESS

    Score27.7

    Track record
    5.0/30
    Service breadth
    12.7/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    10.0/10
  18. 18

    Decerna

    Cramlington · est. 2012 · 3–250 MW

    Northumberland-based energy consultancy, formerly Narec Distributed Energy, whose grid-scale renewables and storage work includes budget enquiries, G99 and G100 applications, National Grid pre-applications and grid connection assessments for wind, solar and battery projects.

    UnverifiedWindSolarBESS

    Score27.4

    Track record
    10.0/30
    Service breadth
    9.1/20
    Network coverage
    1.3/20
    Verification
    0.0/20
    Experience
    7.0/10
  19. 19

    Star Delta Power

    Holmfirth · est. 2018 · 48.8–200 MW

    Chartered-engineer-led consultancy in West Yorkshire focused on UK grid connections, providing G99 Type C and D compliance packages, protection studies and relay settings, P28 and G5/5 studies, cable system design and independent design assurance.

    UnverifiedBESSIndustrial

    Score27.1

    Track record
    15.0/30
    Service breadth
    5.5/20
    Network coverage
    2.7/20
    Verification
    0.0/20
    Experience
    4.0/10
  20. 20

    PSE2 Consulting

    Bristol · est. 2016 · 1–50 MW

    Power systems consultancy with offices in Bristol and Cardiff that runs grid connection studies (harmonics, flicker, fault infeed, stability), supports ENA connection applications and DNO liaison, and provides electrical design, earthing and arc flash services.

    UnverifiedEV hubsSolarWindBESSIndustrial

    Score25.4

    Track record
    10.0/30
    Service breadth
    9.1/20
    Network coverage
    1.3/20
    Verification
    0.0/20
    Experience
    5.0/10
  21. 21

    ADTEK

    Newcastle upon Tyne · est. 2012 · 1–50 MW

    Newcastle-based renewable energy technical consultancy offering grid connection site assessments, feasibility studies, connection applications and connection offer reviews, alongside power system studies for wind, solar, hydro and battery storage projects.

    UnverifiedWindSolarBESS

    Score22.9

    Track record
    5.0/30
    Service breadth
    10.9/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    7.0/10
  22. 22

    Rapleys

    Huntingdon · est. 2004 · 100 kW – 5 MW

    National property consultancy whose utilities consultancy team handles constraint reporting, site load calculations, point of connection applications and competing DNO, ICP and IDNO quotations for land and housing development projects.

    UnverifiedHousing

    Score22.3

    Track record
    5.0/30
    Service breadth
    7.3/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    10.0/10
  23. 23

    Action Renewables

    Belfast · est. 2003 · 50 kW – 10 MW

    Belfast-based charity and energy trading organisation that runs a grid connection service for generators in Northern Ireland. It checks capacity, prepares and submits G99/NI and G98/NI applications with single line diagrams to NIE Networks, answers network operator queries and advises on compliance and turbine repowering.

    UnverifiedWindSolar

    Score18.6

    Track record
    0.0/30
    Service breadth
    7.3/20
    Network coverage
    1.3/20
    Verification
    0.0/20
    Experience
    10.0/10
  24. 24

    UK Power Engineers

    London · est. 2013 · 10–50 MW

    London and Reading-based power engineering consultancy that, alongside network design work, supports renewable developers with ENA G99 connection applications, DNO liaison, connection offer reviews and cost analysis for solar, battery and generation schemes connecting at 33kV to 132kV.

    UnverifiedSolarBESSIndustrial

    Score17.4

    Track record
    0.0/30
    Service breadth
    10.9/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    6.5/10
  25. 25

    Locogen

    Edinburgh · est. 2009 · 20–110 MW

    Edinburgh renewable energy consultancy working on onshore wind, ground-mounted solar and battery storage across the UK. Alongside planning, environmental and owner's engineer work, it supports grid connection applications, connection strategy and Gate 2 submissions under the reformed connections process.

    UnverifiedWindSolarBESS

    Score15.8

    Track record
    0.0/30
    Service breadth
    7.3/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    8.5/10
  26. 26

    Roadnight Taylor

    Burford · est. 2013 · 1–100 MW

    Oxfordshire-based grid consultancy that advises developers, investors, data centre operators, industrial users and public bodies on electricity network connections, covering feasibility, applications, connection offer review, Grid Code compliance and acquisition due diligence.

    UnverifiedData centreBESSSolarWindIndustrialHousing

    Score15.6

    Track record
    0.0/30
    Service breadth
    9.1/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    6.5/10
  27. 27

    EA Technology

    Chester · est. 1990 · 100 kW – 50 MW

    Chester-based power engineering and asset management company whose network studies team carries out ENA G99 Grid Code compliance studies for generation and storage connecting to distribution networks, alongside load flow, fault level and protection studies.

    UnverifiedBESS

    Score15.5

    Track record
    0.0/30
    Service breadth
    5.5/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    10.0/10
  28. 28

    TriConnex

    Braintree · est. 2010 · 100 kW – 12 MW

    Braintree-based multi-utility connections provider for residential developers. Its feasibility studies and Grid Dynamix service assess loads, secure and track electricity capacity applications, and it designs and builds networks as a NERS-accredited ICP.

    UnverifiedHousing

    Score15.3

    Track record
    0.0/30
    Service breadth
    7.3/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    8.0/10
  29. 29

    Artios Energy

    Edinburgh · est. 2021 · 1–100 MW

    Edinburgh-based consultancy focused on electrical connections for renewable generation, covering wind, solar, battery storage and small hydro. Services include grid feasibility, connection applications, offer review, G99 and Grid Code compliance, curtailment assessment and power system studies.

    UnverifiedWindSolarBESS

    Score15.2

    Track record
    0.0/30
    Service breadth
    12.7/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    2.5/10
  30. 30

    HZ Power

    London · est. 2021 · 94 kW – 960 MW

    London-registered engineering consultancy offering grid applications, grid origination, feasibility, curtailment analysis and connection due diligence, plus power system studies including G99 compliance, G5/5 harmonics, P28, load flow and earthing.

    UnverifiedSolarBESSData centre

    Score13.4

    Track record
    0.0/30
    Service breadth
    10.9/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    2.5/10
  31. 31

    Utility Connections

    Warrington · est. 2019 · 100 kW – 20 MW

    Daresbury-based multi-utility consultancy, part of the UIG Group, offering feasibility studies, load assessments, point of connection applications and challenges to reinforcement costs for data centre, industrial, logistics and commercial developments across the UK.

    UnverifiedData centreIndustrialSolarBESS

    Score12.6

    Track record
    0.0/30
    Service breadth
    9.1/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    3.5/10
  32. 32

    Utility Source

    Rotherham · est. 2018 · 10 kW – 1 MW

    Small South Yorkshire utilities consultancy founded in 2018 that advises property developers and investors on electricity, gas, water and telecoms connections, including DNO and ICP liaison, new supplies and substation requirements, from pre-acquisition to handover.

    UnverifiedHousingIndustrial

    Score9.5

    Track record
    0.0/30
    Service breadth
    5.5/20
    Network coverage
    0.0/20
    Verification
    0.0/20
    Experience
    4.0/10
§02Comparison

Service key

FS
Feasibility and grid capacity studies
CA
Connection applications
TX
NESO / transmission connections
DX
DNO / distribution connections
G9
G99 / G100 compliance
OR
Connection offer review
QM
Queue management and Gate 2
PW
Private wire and behind-the-meter
IC
ICP / IDNO delivery
PS
Power systems studies
PL
Planning support

Compare by sector, region and service

Ranked by a published formulaMethodology

Showing 32 of 32

Best grid connection consultants in the UK (2026), ranked
RankConsultancyServicesDNO coverageTypical sizeScore
01Green Cat Renewables

Biggar · est. 2005 · 51-200 staff

Unverified

Wind · Solar · BESS

ServicesDNO areas05/15Size500 kW – 69 MWScore59.4
02Power On Connections

Coventry · est. 2003 · 200+ staff

Unverified

Data centre · Industrial · Housing · BESS · Solar · Wind

ServicesDNO areas14/15Size500 kW – 100 MWScore55.9
03UCML

Wrexham · est. 2004 · 16-50 staff

Unverified

Housing · Industrial · Data centre · Solar

ServicesDNO areas04/15Size350 kW – 3 MWScore52.6
04Aurora Power Consulting

Bristol · est. 2007 · 6-15 staff

Unverified

BESS · Solar · Wind · Data centre · Industrial

ServicesDNO areas00/15Size10–250 MWScore50.4
05EnergyForce

Withernsea · est. 2014 · 6-15 staff

Unverified

EV hubs · Industrial · Solar · BESS

ServicesDNO areas14/15Size40–250 kWScore46.9
06Blake Clough Consulting

Slaithwaite · est. 2021 · 51-200 staff

Unverified

Wind · Solar · BESS · Data centre

ServicesDNO areas00/15Size50–110 MWScore43.9
07Fulcrum

Sheffield · est. 2005 · 200+ staff

Unverified

Data centre · Housing · EV hubs · Industrial · Solar

ServicesDNO areas02/15Size100 kW – 49.9 MWScore39.9
08TNEI

Manchester · est. 1999 · 51-200 staff

Unverified

Wind · Solar · BESS · Data centre · Industrial

ServicesDNO areas00/15Size1–200 MWScore39.5
09Pure Green Consulting

Newport · est. 2017 · 6-15 staff

Unverified

Solar · BESS · Wind

ServicesDNO areas01/15Size25–600 MWScore36.7
10SLR Consulting

London · est. 1994 · 200+ staff

Unverified

Wind · Solar · BESS · Data centre · Industrial · EV hubs

ServicesDNO areas01/15Size1–100 MWScore35.9
11Engineering Power Solutions

Stockton-on-Tees · est. 2012 · 6-15 staff

Unverified

BESS · Wind · Solar · Data centre · Industrial

ServicesDNO areas01/15Size2–200 MWScore34.2
12Grid Connection Consulting

Linlithgow · est. 2007 · 1-5 staff

Unverified

Wind · Solar · BESS

ServicesDNO areas00/15Size150 kW – 2000 MWScore33.6
13RSK Utility Consulting

Ipswich · est. 2018 · 6-15 staff

Unverified

Wind · BESS · Solar · EV hubs · Housing · Industrial · Data centre

ServicesDNO areas02/15Size50 kW – 100 MWScore32.6
14Power and Grid Engineering

Stoke-on-Trent · est. 2022 · 1-5 staff

Unverified

Solar · Wind · BESS · Data centre · Industrial

ServicesDNO areas14/15Size1–100 MWScore31.6
15Connectus Utilities

Leicester · est. 2023 · 6-15 staff

Unverified

Housing · Industrial · Data centre

ServicesDNO areas02/15Size50 kW – 2 MWScore30.1
15DNO Renewables

Blyth · est. 2024 · 1-5 staff

Unverified

Solar · BESS · EV hubs · Industrial · Housing

ServicesDNO areas15/15Size4 kW – 50 MWScore30.1
17Natural Power

Castle Douglas · est. 1995 · 200+ staff

Unverified

Wind · Solar · BESS

ServicesDNO areas00/15Size5–100 MWScore27.7
18Decerna

Cramlington · est. 2012 · 6-15 staff

Unverified

Wind · Solar · BESS

ServicesDNO areas01/15Size3–250 MWScore27.4
19Star Delta Power

Holmfirth · est. 2018 · 1-5 staff

Unverified

BESS · Industrial

ServicesDNO areas02/15Size48.8–200 MWScore27.1
20PSE2 Consulting

Bristol · est. 2016 · 6-15 staff

Unverified

EV hubs · Solar · Wind · BESS · Industrial

ServicesDNO areas01/15Size1–50 MWScore25.4
21ADTEK

Newcastle upon Tyne · est. 2012 · 1-5 staff

Unverified

Wind · Solar · BESS

ServicesDNO areas00/15Size1–50 MWScore22.9
22Rapleys

Huntingdon · est. 2004 · 51-200 staff

Unverified

Housing

ServicesDNO areas00/15Size100 kW – 5 MWScore22.3
23Action Renewables

Belfast · est. 2003 · 1-5 staff

Unverified

Wind · Solar

ServicesDNO areas01/15Size50 kW – 10 MWScore18.6
24UK Power Engineers

London · est. 2013 · 6-15 staff

Unverified

Solar · BESS · Industrial

ServicesDNO areas00/15Size10–50 MWScore17.4
25Locogen

Edinburgh · est. 2009 · 16-50 staff

Unverified

Wind · Solar · BESS

ServicesDNO areas00/15Size20–110 MWScore15.8
26Roadnight Taylor

Burford · est. 2013 · 16-50 staff

Unverified

Data centre · BESS · Solar · Wind · Industrial · Housing

ServicesDNO areas00/15Size1–100 MWScore15.6
27EA Technology

Chester · est. 1990 · 51-200 staff

Unverified

BESS

ServicesDNO areas00/15Size100 kW – 50 MWScore15.5
28TriConnex

Braintree · est. 2010 · 200+ staff

Unverified

Housing

ServicesDNO areas00/15Size100 kW – 12 MWScore15.3
29Artios Energy

Edinburgh · est. 2021 · 1-5 staff

Unverified

Wind · Solar · BESS

ServicesDNO areas00/15Size1–100 MWScore15.2
30HZ Power

London · est. 2021 · 1-5 staff

Unverified

Solar · BESS · Data centre

ServicesDNO areas00/15Size94 kW – 960 MWScore13.4
31Utility Connections

Warrington · est. 2019 · 16-50 staff

Unverified

Data centre · Industrial · Solar · BESS

ServicesDNO areas00/15Size100 kW – 20 MWScore12.6
32Utility Source

Rotherham · est. 2018 · 6-15 staff

Unverified

Housing · Industrial

ServicesDNO areas00/15Size10 kW – 1 MWScore9.5
§03Questions

Frequently asked questions

Q01What does a grid connection consultant do?

A grid connection consultant helps a project get connected to the electricity network on workable terms. Typical work includes assessing capacity at candidate sites, preparing applications to the DNO or NESO, reviewing and negotiating connection offers, managing queue position, and commissioning technical studies.

Q02How is this ranking calculated?

Every listed consultancy is scored with the same published formula covering track record, service breadth, network coverage, verification and experience. The weights and rules are on the How we rank page.

Q03Do I need a consultant to apply for a grid connection?

No. Anyone can apply directly to a DNO or to NESO. Developers use consultants to save time, avoid costly mistakes in applications, and get a second opinion on the terms and cost in a connection offer.

Q04How are grid connection consultants paid?

Common models include fixed fees for feasibility studies and applications, day rates for advisory work and, occasionally, success-related fees. Ask for a written scope before you commit.

Q05What is the difference between a DNO and a transmission connection?

Distribution connections are made to the local network operator (the DNO), typically up to 132 kV in England and Wales. Transmission connections are made to the high-voltage network and are applied for through NESO in Great Britain or SONI in Northern Ireland.

§04Authorship