Consultancy profile · GCC-C13
Green Cat Renewables
Scottish renewable energy consultancy based in Biggar that supports wind, solar, hydro and hybrid projects from feasibility to operation. Its grid team prepares connection applications, reviews connection agreements, liaises with network operators and models network constraints for distribution and transmission connections.
- Overall rank
- 01 of 32
- Score
- 59.4
- Headquarters
- Biggar
- Founded
- 2005
- Team
- 51-200 staff
- Typical size
- 500 kW – 69 MW
- Status
- Unverified · seen 07 Nov 2026
Ranked by a published formulaMethodology
§01Services
Services offered
7 of our 11 service lines. Legal advice is outside the scope of this directory.
- FSFeasibility and grid capacity studies(offered)
- CAConnection applications(offered)
- TXNESO / transmission connections(offered)
- DXDNO / distribution connections(offered)
- G9G99 / G100 compliance(not offered)
- ORConnection offer review(offered)
- QMQueue management and Gate 2(not offered)
- PWPrivate wire and behind-the-meter(not offered)
- ICICP / IDNO delivery(not offered)
- PSPower systems studies(offered)
- PLPlanning support(offered)
§02Sectors
§03Coverage
Regions and network areas
Regions served
- Scotland
- North East England
- North West England
- Yorkshire and the Humber
- East Midlands
- West Midlands
- Wales
- East of England
- London
- South East England
- South West England
DNO licence areas worked in (5/15)
- SHEPDSSEN Distribution (North of Scotland)
- SPDSP Distribution
- SWESTNational Grid Electricity Distribution (South West)
- EMIDNational Grid Electricity Distribution (East Midlands)
- ENWLSP Electricity North West
- SHEPDSSEN
- SPDSPEN
- NPgNNPg
- ENWLSPEN
- SPMSPEN
- NPgYNPg
- SWALESNGED
- WMIDNGED
- EMIDNGED
- EPNUKPN
- SWESTNGED
- SEPDSSEN
- LPNUKPN
- SPNUKPN
- NIENIE
§04Projects
Notable projects
| Project | Sector | Capacity | Year | Location |
|---|---|---|---|---|
| Tormywheel Wind FarmRole: Client's Engineer, managing the turbine, balance of plant and grid connection contracts | Wind | 30.8 MW | 2017 | Levenseat, West Lothian |
| Hill of Glaschyle Wind FarmRole: Technical adviser to the funder | Wind | 27.6 MW | 2017 | Forres, Moray |
| Watson Head Wind FarmRole: Client's Engineer and electrical designer | Wind | 8.4 MW | — | North Lanarkshire |
| Garth WindRole: Client's Engineer | Wind | 4.5 MW | — | North Yell, Shetland |
| Aldercombe BartonRole: Joint venture developer; negotiated a restricted-export DNO connection | Wind | 500 kW | — | Bude, Cornwall |
| Bryngolwg and Horsey Levels Solar FarmsRole: Pre-construction due diligence, including review of grid connection offers, and technical adviser | Solar | 46 MW | — | Wales and Somerset |
As stated by the firm.
§05Credentials
Accreditations
None listed.
Contact
- Website
- greencatrenewables.co.uk
- Phone
- +44 1899 309 100
- Address
- Bethany Hall, 29a High Street, Biggar, South Lanarkshire
- HQ
- Biggar
§06Score
How this firm scores
Ranked by a published formulaMethodology
59.4out of 100 · rank 01
- Track record
- 30.0/30
- Service breadth
- 12.7/20
- Network coverage
- 6.7/20
- Verification
- 0.0/20
- Experience
- 10.0/10
§07Corrections
Is this your firm?
Claim the profile to update details and submit evidence for verification. Claiming is free.
Report an error on this page
Profile last checked 07 Nov 2026 · Other regions: Northern Ireland